Pharma MES & Batch
GMP-certified facility · 2025 · Manufacturing
MES, batch release, and LIMS bridge at a GMP site — full electronic trace.
Context
Lot breakage, manual COA entry, and 48-hour release delays.
Technology solution
Event-sourced MES, LIMS API, and automated batch release workflow; operator tablet + barcode.
Outcomes
- ◆Release time −62%
- ◆Zero lot errors (6 mo)
- ◆Full trace at GMP audit
Stack
- React
- PostgreSQL
- Kafka
- SAP
- HL7